A company operates a line that produces self-adhesive tiles. The production line of a company consists of single-machine stations and is almost balanced (i.e., station rates are nearly equal).
A company operates a line that produces self-adhesive tiles. The
production line of a company consists of single-machine stations and is
almost balanced (i.e., station rates are nearly equal). A company
engineer has estimated the bottleneck rate to be 2200 cases per 16-hour
day and the raw process time to be 30 minutes. The line has averaged
1,500 cases per day, and cycle time has averaged 5 hours.
What is the estimated average WIP level? also show calculations please
What is the estimated average WIP level? also show calculations please