Skip to main content

Project Management and Software U22327

School of Civil Engineering and
Surveying
Student Registration Number:
Course: Date Set: 09/01/2018
Project Management and Software U22327 Lecturer: Dr Salam Al-Bizri Date Due: 29/03/2018
Artefact: Coursework Ref:

Objectives:
Incorporating and coordinating the programmes of specialist trade packages is the most important and complex part
of the planning and scheduling of a project. The purpose of this assignment is to:
Develop a process model that is sufficiently detailed to show the relative timing of the information flows
between the specialist trade packages.
Investigate the advantages and the barriers to implementing project management software.
Tasks:
Based on the Concrete Floor Cycle Case Study, produce a 3000-word Project Management Report that includes the
following:

Select a specialist trade package and propose the scope of this package. [5 marks]
Formulate how the selected package fits in the overall construction process. [10 marks]
Assemble the programme information that the selected package requires from, and the programme
information it has to supply to; other packages. [10 marks]

 

Develop an IDEF0 process map that shows the information flows within the package and across the
interface boundaries with other packages. [15 marks]
Timing
Conclude the relative timing for the information flows identified above. [10 marks]

Appraisal
Taking into consideration the interfaces and the constraints of the case study project, investigate the following:
MS Project software capability of encompassing your findings above for the following two programmes:

The overall structural construction programme. [10 marks]
The selected trade package programme. [10 marks]
The advantages and barriers to the effective implementation of 4D BIM. [15 marks]
The advantages and barriers to the effective implementation of ADePT. [15 marks]

Learning outcomes:
On successful completion of this assignment, students will be expected to:
1. Plan using industry-standard project management software
2. Evaluate the effectiveness of project management software
Reading / References: (The following list is not exclusive)
1. Austin, S, Baldwin, A, Baizhan, L, & Waskett, P 2000, ‘Analytical design planning technique (ADePT): a
dependency structure matrix tool to schedule the building design process’,
Construction Management &
Economics
, 18, 2, pp. 173-182, Business Source Complete, EBSCOhost, viewed 2 December 2017.
2. Dash, S.N., 2013, PMBOK Guide 5
th Edition and MS Project 2010: A Practical Step-by-Step Approach. PM
World Journal Volume: 2 Issue: 2 (2013-02-01) p. 1-18. ISSN: 2330-4480
3. Harris, P. E., 2010, Planning and Control Using Microsoft® Project 2010 and PMBOK Guide® Fourth Edition,
In Microsoft Project 2010.Victoria, Australia (9781921059506)
4. Harris, P. E., 2010, Planning and Scheduling Using Microsoft Project 2010, In Microsoft Project 2010.Victoria,
Australia (9781921059483)
5. Race, S 2013, BIM Demystified: An Architect’s Guide to Building Information Modelling/Management (BIM), n.p:
London : RIBA Publishing, Library Catalogue, EBSCOhost.

The University of Portsmouth regulations require students to keep electronic copies
of all assignments, and submit these at any time upon request.
This sheet must be submitted with your assignment.
Student Evaluation and Student Comment to be completed before submission.

Indicative Grade Criteria:

A* As below plus:
An exceptional report which is concise; clearly shows the issues presented by the case study and
applies knowledge to offer appropriate solutions to the tasks.
Extensive references &/or bibliography using the subject convention.
Presented in a highly professional format with excellent structure and no errors in grammar,
spelling, or punctuation.
A As below plus:
Thorough completion of tasks and showing evidence of considerable research beyond
recommended textbooks and the internet.
An excellent report, written and presented in a professional manner with work showing insight into
the issues presented by the case study and potential ways forward.
References &/or bibliography presented according to subject convention
Well presented, well structured, a good organisation with few or no errors in grammar, spelling, or
punctuation. Presentation of diagrams &/or tables follows required format
B As below plus:
Adequate completion of the tasks and showing evidence of research beyond recommended
textbooks and the internet with a good understanding of the case study.
A report, which answers the tasks in a thorough, thoughtful and competent manner with few errors
or gaps in content, explanation or accuracy
References &/or bibliography usually presented according to subject convention
Well presented, clearly written, few errors in structure, organisation, expression, grammar,
spelling, punctuation and presentation/use of diagrams &/or tables
C As below plus:
A report which strives to answer the tasks, but the logical links between the tasks are vague or
have omissions in content
Attempts made at research beyond recommended texts with attempt to present/use references/
bibliography according to subject convention
Generally follows instructions regarding organisation, expression, grammar, spelling, punctuation
and presentation/use of diagrams &/or tables
D Adequate descriptive work that attempts to focus on & show basic grasp of the topic
Limited research using mainly provided material. Attempts to use &/or present
references/bibliography according to convention
Limited prose style attempting to following instructions regarding organisation, expression,
grammar, spelling, punctuation and presentation/use of diagrams &/or tables
Fail / E FAIL Anything which is inadequate in most or all of the following: length, content, structure,
organisation, expression, discussion, explanation, accuracy and relevance. Work in this range attempts
to address the question/problem but is substantially incomplete and deficient. Serious problems with a
number of aspects of language use are often found in work in this range and the work may be severely
under/over-length.
Fail / F FAIL No serious attempt to address the question or problem, and/or manifests a serious
misunderstanding of the requirements of the assignment. Acutely deficient in all aspects.

 



Logo GET THIS PAPER COMPLETED FOR YOU FROM THE WRITING EXPERTS  CLICK HERE TO ORDER 100% ORIGINAL PAPERS AT PrimeWritersBay.com

Comments

Popular posts from this blog

Identify and discuss a key milestone in the history of computers that interests you and why.

  Part 1Title: Lab ResponseDiscuss one feature of MS Word and one feature of MS Excel that you found challenging within the lab and why. Examples are WordArt, inserting shapes, adding borders, cell styles, etc. This response should be at least one paragraph in length. Part 2Title: History of Computers Identify and discuss a key milestone in the history of computers that interests you and why. This section should be at least one paragraph. Part 3Title: System Software vs. Application Software In your words, explain the difference between application software and system software as if to another coworker who has limited technical knowledge. Use examples to support your rationalization. This section should be at least two paragraphs. Part 4Title: Blockchain and Cryptocurrency In a minimum of one paragraph each: 1. Conduct some research on the internet and discuss one underlying technology of cryptocurrencies like blockchain, cryptography, distributed ledger technol...

You have been given the t

PPMP20009 Leading Lean Projects Term 2, 2018 Page 1 of 3 Assessment 1 (Individual Work – 40%) Case study: Managing Lean Project Introduction You have been given the task to organise the FIFA 2018 World Cup football tournament ( https://ift.tt/2If0UDE ). (For those not familiar with football, you may change the event to the recently concluded 2018 Gold Coast Commonwealth Games: https://gc2018.com/ ). Your tasks This assessment item requires you to work INDIVIDUALLY. 1. As the project manager in charge of delivering such as an important world sporting event: i. Identify and elaborate the following terms with regards to the event. a. Voice of the Customer (VOC) b. Critical to Customer Requirements (CCR) c. Critical to Quality parameters (CTQ) ii. In what ways would you have implemented lean project management for this event? Identify and elaborate processes from PMBOK, PRINCE2, Organisational Project iii. Management Agile Practices and Lean Six Sigma (DMAIC Me...

Cybersecurity and Infrastructure Security (CISA)

 Develop a research paper that identifies a specific Department of Homeland Security (DHS) operating agency. Fully describe 1 DHS operating agency from the following list: Cybersecurity and Infrastructure Security (CISA) U.S. Customs and Border Protection (CBP) U.S. Citizenship and Immigration Services (USCIS) Federal Emergency Management Agency (FEMA) U.S. Coast Guard (USCG) U.S. Immigration and Customs Enforcement (ICE) U.S. Secret Service (USSS) Transportation Security Administration (TSA) The information must include a discussion of the selected DHS agency. Identify the agency’s mission, goals, objectives, and metrics. Conduct an analysis of how these mission areas address the threats or challenges. Recommend agency program priorities among the current set of goals, objectives, metrics, or budget items. Justification of all choices is an essential element of this assignment. Reference all source material and citations using APA format. WE OFF...