family about to undertake a new build.

Referencing Styles : Harvard

  • Mr and Mrs Smith are a young family about to undertake a new build.
  • They have a set of plans from an architect which the builder advised on.
  • The client has a strong regard for WHS as he is an employee for Work Cover
  • The brick chosen is a Sydney Town Woodstock determined by the builder from Boral.
  • The client is funding the project via savings (40%) and borrowing from the bank in the form of a construction loan (60%).
  • The client is extremely meticulous on quality.

 

CPCCBC4001A APPLY BUILDING CODES AND STANDARDS TO THE CONSTRUCTION PROCESS FOR LOW RISE BUILDING PROJECTS

 

  1. Classify all the components of the house i.e. fence , house,  pool, garden shed retaining wallsCPCCBC4002A MANAGE OCCUPATIONAL HEALTH AND SAFETY IN THE BUILDING AND CONSTRUCTION PROCESS  

 

The site has to become WHS compliant

 

  1. Identify hazards specific for three trades. Include their work processes and there equipment used to complete a task.

 

  1. Show examples of controls put in place, and justify the selection of the controls by discussion with the WHS hierarchy of controls.

 

  1. Please refer to the WHS code of practice in working safely at heights and make some recommendations as to how the work at heights on this project should be coordinated.

 

  1. How would you gage and monitor the effect of your implemented controls?

 

  1. How would you communicate the control process?

 

  1. Provide an onsite inspection report.CPCCBC4003A SELECT AND PREPARE A CONSTRUCTION CONTRACT

 

  1. Download and complete a suitable contract for this project.
  2. List further contractual documentation.

CPCCBC4004A IDENTIFY AND PRODUCE ESTIMATED COSTS FOR BUILDING AND CONSTRUCTION PROJECTS  

 

  1. Please identify plant and equipment related to the plans.11. Discuss the planning and approval process and show in order of preference.
  2. Identify 5 materials from the plan and discuss the procurement process
  3. On the same project, the plans require (BlueScope) custom orb or similar. Research a manufacturers technical data sheets. What are their requirements for these sheets? You must provide manufacturers data to support your answer.Test Materials on site. The concrete for the footing has been specified as per table above

 

 

 

  1. What Concrete Grade is specified and what does it mean?

 

15     What is the maximum slump specified and what does it mean?

 

  1. What is the allowable tolerance that the Australian Standard allows for a slump (What is min & max). Provide evidence for you answer

 

  1. What is the purpose of a slump test and why is there a minimum and maximum tolerance for the slump?

 

  1.  How do we test the concrete for slump?

 

  1.  What is the Max Agg size & what does it mean?

 

  1. What is the Cement Type?

 

  1. . The specification states that the timber frame must be H2 MGP10 what does this mean. How do you confirm that was supplied?

 

  1. . The Roof is to be made from trusses. Research a manufactures guide and describe the installation process and safe handling procedures. Provide evidence for you process.

 

  1. . Nominate 3 typical truss types that would be part of the roofing system for the project

Explain the requirements for storage of the trusses if you had to accept delivery before you are ready for installation. Provide evidence of manufacturer’s guides.CPCCBC4007A PLAN BUILDING OR CONSTRUCTION WORK

 

  1. Can you discuss the procurement process with the brickwork and how would you manage the unavailability of the specified design of brick

 

  1. Draft a letter to the client about the alternative solution to the change in brickwork

 

  1. Design a construction program, draw a critical path diagram, and include clear milestones

 

  1. Such as , Approval , Set up / Establishment , Excavation , Site works and set out , Scaffolding Concreting for strip footings  , Bricklaying to sub floor  , Timber frame complete , Roofing installed  , Bricklaying of remaining brickwork , Roof completed , windows installed ,  services installed , Plasterboard , fix out , fit out , wet areas , joinery , land scaping

Please allow lead times for windows and framing material of 4 weeks.

BSBPMG522A UNDERTAKE PROJECT WORK  

  1. Can you detail the required period of storage for employee records, taxation within a business, asbestos removal and workers compensation

CPCCBC4008B CONDUCT ONSITE SUPERVISION OF BUILDING AND CONSTRUCTION PROJECTS

  1. List some items that you could record within your diary on a day to day basis
  2. 34.   List the required statutory inspections from the DA

BSBSMB406A MANAGE SMALL BUSINESS FINANCE

  1. The project value is $ 500 000. Can you please list the progress payment schedule as per the contract and mark the milestones on your critical path drawing.
  2. Allow for a variation of $ 30 000 between progress payment 3 and 4 , can you please write an extension of claim as per contract  and variation to suit and note the change in the completion date ( estimated to take an extra 21 days )

 

 

CPCCBC4009B APPLY LEGAL REQUIREMENTS TO BUILDING AND CONSTRUCTION PROJECTS

  1. Do your subcontractors require a licence?
  2. You’re a Pty. Company. What are the naming and registration requirements involved with this and who does the company need to be registered with?
  3. The contract specifies that you as the builder are required to insure the works and identify the client as a result of injury to persons on site including public risk , client or worker , what insurances do you need ?

 

  1. As the builder of this project, compile a checklist of required documentation that the subcontractor has to supply before they begin work, does this list change from business entity, i.e. sole trader to PTY LTD?
  2. Provided is a picture , can u please label the items and discuss ( SEE FIGURE 1.2 )

 

  1. Describe briefly the termite system you would use on this plan34.   Allow for a variation of $ 30 000 between progress payment 3 and 4 , can you please write an extension of claim as per contract  and variation to suit and note the change in the completion date ( estimated to take an extra 21 days )

 

 

CPCCBC4009B APPLY LEGAL REQUIREMENTS TO BUILDING AND CONSTRUCTION PROJECTS

  1. Do your subcontractors require a licence?
  2. You’re a Pty. Company. What are the naming and registration requirements involved with this and who does the company need to be registered with?
  3. The contract specifies that you as the builder are required to insure the works and identify the client as a result of injury to persons on site including public risk , client or worker , what insurances do you need ?
  4. As the builder of this project, compile a checklist of required documentation that the subcontractor has to supply before they begin work, does this list change from business entity, i.e. sole trader to PTY LTD? 34.   Provided is a picture , can u please label the items and discuss ( SEE FIGURE 1.2 )
  5. Describe briefly the termite system you would use on this plan
  6. Provided is a picture , can u please label the items and discuss ( SEE FIGURE 1.2 )
  7. Describe briefly the termite system you would use on this plan

CPCCBC4012A READ AND INTERPRET PLANS AND SPECIFICATION

  1. Calculate the cross fall of the land across the footprint of the building.
  2. Calculate the drop off for the eaves.
  3. Calculate the riser height to the stair that serves from foyer to the hall adjacent to the living area.
  4. What is the Building alignment setbacks from front and side boundaries.
  5. Which windows numbers are on the Northern Elevation?
  6. Where in relation to the house is the swimming pool located?

 

 

CPCCBC4018A APPLY SITE SURVEY AND SET OUT PROCEDURES TO BUILDING AND CONSTRUCTION PROJECTS 

  1. Determine the grade of the driveway from the garage to the front boundary assuming a straight line.
  2. Determine the in-situ volume of excavation to the basement level.

 

BSBWOR402A PROMOTE TEAM EFFECTIVENESS

  1. Develop and complete a Toolbox Talk record form for the roofing stage of this project.

The form needs to contain the following:

  • Details of how it was generated e.g.: iPad, standardises company form
  • A column outlining who is responsible for ensuring tasks are completed
  • Techniques for communicating information
  • Terms for dealing with team conflict and resolving issues
  • A signature box for all Toolbox members to acknowledge their understanding of the tasks required of them

CPCCBC4024A RESOLVE BUSINESS DISPUTES

  1. Mr and Mrs Smith are having a dispute with the tiler about the laying of rectangular tiles on the wet area walls. Mr and Mrs Smith want the tiles laid vertically but the tiler has laid them horizontally. Write a brief of this dispute, using unambiguous language, so a third party can understand. Your brief needs to be completely impartial.

Include the following:

  • Nature of the dispute
  • Parties of the dispute
  • Identify the processes you would follow before it has reached mediation level
  • Identify the resolution body within your state who deals with this type of dispute

 

 

 



Logo GET THIS PAPER COMPLETED FOR YOU FROM THE WRITING EXPERTS  CLICK HERE TO ORDER 100% ORIGINAL PAPERS AT PrimeWritersBay.com

Comments

Popular posts from this blog

Identify and discuss a key milestone in the history of computers that interests you and why.

  Part 1Title: Lab ResponseDiscuss one feature of MS Word and one feature of MS Excel that you found challenging within the lab and why. Examples are WordArt, inserting shapes, adding borders, cell styles, etc. This response should be at least one paragraph in length. Part 2Title: History of Computers Identify and discuss a key milestone in the history of computers that interests you and why. This section should be at least one paragraph. Part 3Title: System Software vs. Application Software In your words, explain the difference between application software and system software as if to another coworker who has limited technical knowledge. Use examples to support your rationalization. This section should be at least two paragraphs. Part 4Title: Blockchain and Cryptocurrency In a minimum of one paragraph each: 1. Conduct some research on the internet and discuss one underlying technology of cryptocurrencies like blockchain, cryptography, distributed ledger technol...

You have been given the t

PPMP20009 Leading Lean Projects Term 2, 2018 Page 1 of 3 Assessment 1 (Individual Work – 40%) Case study: Managing Lean Project Introduction You have been given the task to organise the FIFA 2018 World Cup football tournament ( https://ift.tt/2If0UDE ). (For those not familiar with football, you may change the event to the recently concluded 2018 Gold Coast Commonwealth Games: https://gc2018.com/ ). Your tasks This assessment item requires you to work INDIVIDUALLY. 1. As the project manager in charge of delivering such as an important world sporting event: i. Identify and elaborate the following terms with regards to the event. a. Voice of the Customer (VOC) b. Critical to Customer Requirements (CCR) c. Critical to Quality parameters (CTQ) ii. In what ways would you have implemented lean project management for this event? Identify and elaborate processes from PMBOK, PRINCE2, Organisational Project iii. Management Agile Practices and Lean Six Sigma (DMAIC Me...

Cybersecurity and Infrastructure Security (CISA)

 Develop a research paper that identifies a specific Department of Homeland Security (DHS) operating agency. Fully describe 1 DHS operating agency from the following list: Cybersecurity and Infrastructure Security (CISA) U.S. Customs and Border Protection (CBP) U.S. Citizenship and Immigration Services (USCIS) Federal Emergency Management Agency (FEMA) U.S. Coast Guard (USCG) U.S. Immigration and Customs Enforcement (ICE) U.S. Secret Service (USSS) Transportation Security Administration (TSA) The information must include a discussion of the selected DHS agency. Identify the agency’s mission, goals, objectives, and metrics. Conduct an analysis of how these mission areas address the threats or challenges. Recommend agency program priorities among the current set of goals, objectives, metrics, or budget items. Justification of all choices is an essential element of this assignment. Reference all source material and citations using APA format. WE OFF...